Screed QA — Elegant Spaces
Quality Control · Photo Checklist
Screed
找平层施工
SiteCam Instructions · 操作说明
1
Open SiteCam and open the project — the project name is the site address
打开 SiteCam,选择对应项目 — 项目名称即为工地地址
2
Take the photo for the first item, then tap Done
拍摄第一项所需照片,然后点击「完成」
3
Move the pin to the exact location on the floor plan where the photo was taken — pinch out to zoom in on the plan
定位针移动到平面图上照片对应的具体位置 — 双指向外滑动可放大平面图
4
Tap Record Type and make sure it is set to Screed
点击「记录类型」,确认已选择「找平层」
5
Tap Save, then move on to the next photo
点击「保存」,然后继续拍摄下一张照片
Photos taken
0 / 12
Before 0/4 After 0/7 Materials 0/1
Complete
All 12 photos taken
Upload to SiteCam before leaving site · 离开工地前请上传全部照片
Before Starting Screed
找平层施工开始前
0/4
01
Confirm the shower rebate is the correct dimensions
请拍照确认:淋浴回槽尺寸正确。
02
Flange glued in place, is level and at the correct depth
请拍照确认:法兰已牢固粘接,保持水平且安装深度正确。
03
Rebate is clean and dust free
请拍照确认:淋浴回槽干净、无灰尘。
04
Slurry coat applied before screeding
请拍照确认:已涂浆料,找平前完成。
After Screed
找平完成后
0/7
05
Screed has the correct drop-down from the concrete
请拍照确认:找平层与混凝土之间的落差正确。
06
Screed has the correct 1:50 falls
请拍照确认:找平层坡度为1:50,符合要求。
07
Screed is level around the perimeter for centre waste showers
请拍照确认:如为中心地漏,找平层周边保持水平。
08
Waste pipe clean and free of debris
请拍照确认:排水管干净、无杂物。
09
Waste pipe has been covered to prevent debris entering
请拍照确认:排水管已覆盖,防止杂物进入。
10
Overall zoomed-out photo of the finished screed
请拍照确认:完成找平层的整体远景照片。
11
Work area left clean and tidy
请拍照确认:施工区域已清理干净、保持整洁。
Materials Record
材料记录
0/1
12
Photo and description of materials left on-site or taken away
请拍照并说明:现场遗留或带走的任何材料。