Screedingsitecam

Screed QA — Elegant Spaces
Quality Control · Photo Checklist
Screed
水泥找平施工
SiteCam Instructions · 操作说明
1
Open SiteCam and open the project — the project name is the site address
打开 SiteCam,选择对应项目 — 项目名称即为工地地址
2
Take your photos — you can take multiple photos at once, then press Done to go to the edit screen
拍摄照片 — 可连续拍摄多张,完成后点击「完成」进入编辑界面
3
On the edit screen — pin the group of photos to the correct room on the floor plan
在编辑界面 — 将这组照片标注到平面图上对应的房间位置
4
Set the record type to Screed
记录类型设置为「水泥找平」
5
Pin to the floor plan, press Save then move on to the next item
标注到平面图,点击「保存」,然后继续下一项检查
Photos taken
0 / 12
Before 0/4 After 0/7 Materials 0/1
Complete
All 12 photos taken
离开工地前请上传全部照片至 SiteCam
Before Starting Screed
开始水泥找平前
0/4
Take multiple photos to capture all items, pin group to the correct room on the floor plan. Record type: Screed
连拍多张照片覆盖所有检查项,将这组照片标注到平面图对应房间。记录类型:水泥找平
01
Confirm the shower rebate is the correct dimensions
拍照确认:淋浴地台槽尺寸正确。
02
Flange glued in place, is level and at the correct depth
拍照确认:地漏法兰已固定到位,保持水平且深度正确。
03
Rebate is clean and dust free
拍照确认:地台槽干净,无灰尘杂物。
04
Slurry coat applied before screeding
拍照确认:找平前已涂刷水泥浆结合层。
After Screed
水泥找平完成后
0/7
Take multiple photos to capture all items, pin group to the correct room on the floor plan. Record type: Screed
连拍多张照片覆盖所有检查项,将这组照片标注到平面图对应房间。记录类型:水泥找平
05
Screed has the correct drop-down from the concrete
拍照确认:找平层与混凝土楼板的标高差正确。
06
Screed has the correct 1:50 falls
拍照确认:找平层排水坡度为1:50,符合要求。
07
Screed is level around the perimeter for centre waste showers
拍照确认:中心地漏淋浴房四周找平层保持水平。
08
Waste pipe clean and free of debris
拍照确认:排水管内干净,无建筑垃圾。
09
Waste pipe has been covered to prevent debris entering
拍照确认:排水管已封盖,防止建筑垃圾进入。
10
Overall zoomed-out photo of the finished screed
拍照确认:拍一张完成后的整体全景照片。
11
Work area left clean and tidy
拍照确认:施工区域已清扫干净、整理整洁。
Materials Record
材料记录
0/1
Pin to where materials are stored on the floor plan. Record type: Screed
将照片标注到平面图上材料存放位置。记录类型:水泥找平
12
Photo and description of materials left on-site
拍照记录现场剩余材料。