tiling ( before fit off )

Tiling (Before Fit-Off) — Elegant Spaces
Quality Control · Photo Checklist
Tiling (Before Fit-Off)
瓷砖施工(安装前)
SiteCam Instructions · 操作说明
1
Open SiteCam and open the project — the project name is the site address
打开 SiteCam,选择对应项目 — 项目名称即为工地地址
2
Take your photos — you can take multiple photos at once, then press Done to go to the edit screen
拍摄照片 — 可连续拍摄多张,完成后点击「完成」进入编辑界面
3
On the edit screen — pin the group of photos to the correct room on the floor plan
在编辑界面 — 将这组照片标注到平面图上对应的房间位置
4
Set the record type to match the section you are working on — see each section below
记录类型设置为当前施工阶段 — 详见下方各分区说明
5
Pin to the floor plan, press Save then move on to the next item
标注到平面图,点击「保存」,然后继续下一项检查
Photos taken
0 / 6
Before 0/1 During 0/3 After 0/2
Complete
All photos taken — upload to SiteCam
Upload all photos before moving on to grout and silicone
Before Starting Tiling
开始贴砖前
0/1
Photo burst of all details — close up and pulled back of every internal corner, waterstop and penetration confirming correct second coat coverage. Pin to plan. Record type: Waterproofing 2nd Coat
对所有细部连拍多张照片 — 每个内角、止水条及穿管处的特写和退后照片,确认第二遍防水涂层覆盖正确。标注到平面图。记录类型:防水第二遍
01
Second coat completely dry — close up photos of all details, internal corners, waterstops and penetrations confirming correct coverage. Pin to plan under Waterproofing 2nd Coat
第二遍防水已完全干燥 — 对所有细部、内角、止水条及穿管处拍摄特写照片,确认涂层覆盖正确。标注至平面图,记录类型选防水第二遍。
During Tiling
铺贴瓷砖过程中
0/3
Take photos as you go and pin to the correct room on the floor plan. Record type: Tiling (before fit-off)
施工过程中随时拍摄,标注到平面图对应房间。记录类型:瓷砖施工(安装前)
02
Shower base showing full adhesive coverage
拍照确认:淋浴底部瓷砖背面粘结剂覆盖完整均匀。
03
Walls showing full trowel coverage of adhesive
拍照确认:墙面瓷砖胶已用齿形抹刀均匀满涂。
04
Back buttering of tile showing full coverage
拍照确认:瓷砖背面已满涂瓷砖胶(背涂工艺),覆盖完整。
After Tiling
铺贴完成后
0/2
Photo burst of completed area, pin to the correct room on the floor plan. Record type: Tiling (before fit-off)
对完工区域连拍多张照片,标注到平面图对应房间。记录类型:瓷砖施工(安装前)
05
Overall zoomed-out photo of the area tiled
拍照确认:已铺贴区域的整体远景照片。
06
Work area left clean and tidy
拍照确认:施工区域已清理干净,保持整洁。