SiteCam Instructions · 操作说明
1
Open SiteCam and open the project — the project name is the site address
打开 SiteCam,选择对应项目 — 项目名称即为工地地址
2
Take your photos — you can take multiple photos at once, then press Done to go to the edit screen
拍摄照片 — 可连续拍摄多张,完成后点击「完成」进入编辑界面
3
On the edit screen — pin the group of photos to the correct room on the floor plan
在编辑界面 — 将这组照片标注到平面图上对应的房间位置
4
Set the record type to Underfloor Heating
将记录类型设置为「地暖」
5
Pin to the floor plan, press Save then move on to the next item
标注到平面图,点击「保存」,然后继续下一项检查
Photos taken
0 / 6
Before 0/1
During 0/1
After 0/3
Materials 0/1
Before Starting
施工开始前
0/1
Take multiple photos to capture all items, pin group to the correct room on the floor plan. Record type: Underfloor Heating
连拍多张照片覆盖所有检查项,将这组照片标注到平面图对应房间。记录类型:地暖
01
Floor is clean, dust free and has been primed
拍照确认:地面已清洁,无灰尘,并已完成底涂处理。
During Installation
安装过程中
0/1
Take photos as wires are laid, pin to the correct room on the floor plan. Record type: Underfloor Heating
铺设电线时拍摄照片,标注到平面图对应房间。记录类型:地暖
02
Wires laid and spaced correctly and taped to floor
拍照确认:地暖电线已正确铺设,间距符合要求,并已固定在地面上。
After Installation
安装完成后
0/3
Photo burst of each item, pin to the correct room on the floor plan. Record type: Underfloor Heating
每项连拍多张照片,标注到平面图对应房间。记录类型:地暖
03
Self-levelling compound applied
拍照确认:自流平砂浆已施工完成。
04
Circuit alarm is connected
拍照确认:地暖回路报警器已连接。
05
Work area left clean and tidy
拍照确认:施工区域已清理干净,保持整洁。
Materials Record
材料记录
0/1
Pin to where materials are stored on the floor plan. Record type: Underfloor Heating
将照片标注到平面图上材料存放位置。记录类型:地暖
06
Photo and description of materials left on site
拍照记录现场剩余材料并说明品名及数量。