SiteCam Instructions — All Tasks · 所有任务通用操作说明
1
Open SiteCam and open the project — the project name is the site address
打开 SiteCam,选择对应项目 — 项目名称即为工地地址
2
Take your photos — you can take multiple photos at once, then press Done to go to the edit screen
拍摄照片 — 可连续拍摄多张,完成后点击「完成」进入编辑界面
3
On the edit screen — pin the group of photos to the correct room on the floor plan
在编辑界面 — 将这组照片标注到平面图上对应的房间位置
4
Set the record type to match the task you are working on — see each task checklist for the correct record type
将记录类型设置为当前施工任务 — 具体记录类型详见各任务检查清单
5
Pin to the floor plan, press Save then move on to the next item
标注到平面图,点击「保存」,然后继续下一项检查
Tasks — tap to open checklist
01
›
02
›
03
›
04
›
05
›
06
›
07
›
08
›
09
›
10
›
Health & Safety
健康与安全
Screed
水泥找平
Underfloor Heating
地暖施工
Waterproofing 1st Coat
防水第一遍
Tile & Material Check
瓷砖及材料检查
Waterproofing 2nd Coat
防水第二遍
Tiling (Before Fit-Off)
瓷砖施工(安装前)
Grout, Silicone & Quality Check
填缝、硅胶及质量检查
Finish Tiling & Quality Check (After Fit-Off)
瓷砖收尾及质量检查(安装后)
Fix-Ups & Maintenance
修补与维护